Item Disciplines
Controlled Documents
Thermal calculations
Issued rev 1
| Controlled document | Current revision | Status | Stamped by | Issued | Repository files |
|---|---|---|---|---|---|
|
HEX-27-103 E-1001-TH-001
Thermal rating calculations
|
Rev 1 | Issued | A. Patel, P.Eng. | 2026-02-14 | E-1001 thermal rating.htrx |
Mechanical calculations
Issued rev 0
| Controlled document | Current revision | Status | Based on | Stamped by | Repository files |
|---|---|---|---|---|---|
|
HEX-27-103 E-1001-ME-001
Mechanical design calculations
|
Rev 0 | Issued | TH-001 Rev 1 | R. Sullivan, P.Eng. | E-1001 mechanical design.cw1 |
Fabrication Drawings
6 sheets · working repo active
Sheet
Current rev
Status
Depends on
Drafting file
Next action
HEX-27-103 E-1001-MD-001
General arrangement
Rev 0
Issued
ME-001 Rev 0
Current
HEX-27-103 E-1001-MD-004
Baffle layout
Draft
In drafting
ME-001 Rev 0
Submit release candidate
HEX-27-103 E-1001-MD-005
Nozzle details
Draft
In drafting
ME-001 Rev 0
Submit release candidate
HEX-27-103 E-1001-MD-006
Nameplate and notes
Draft
In drafting
ME-001 Rev 0
Submit release candidate
Recent release activity
A compact audit trail, because apparently industry still demands receipts for
everything
2026-02-14 14:18
Thermal calculations issued at Rev 1
A. Patel authenticated HEX-27-103 E-1001-TH-001 Rev 1. Mechanical repository
marked current and downstream notification sent.
2026-02-20 10:06
Mechanical calculations issued at Rev 0
R. Sullivan authenticated HEX-27-103 E-1001-ME-001 Rev 0 based on TH-001 Rev 1.
Drafting work order created automatically.
2026-02-20 10:08
Drafting work order opened
Work order DW-1842 created for sheets MD-001 through MD-006. Drafting repository
granted collaborative write access within work order context.
2026-02-25 16:31
Initial sheets released
Sheets MD-001, MD-002, and MD-003 released at Rev 0 after engineering acceptance
and validation.
Release readiness
What can move next without starting a fresh ritual dance around PDFs